The property comprises a large distribution warehouse facility with 2 storey offices, which is undergoing comprehensive refurbishment and is due to complete in Q3 2026.
The refurbishment will include a full replacement of outdated gas-fired systems with an all-electric VRF solution, driving significant carbon reductions, while high-efficiency LED lighting with daylight sensing enhances operational efficiency throughout the warehouse and ancillary areas.
Water-saving fixtures—including waterless urinals and point-of-use heaters—further minimise consumption, while the Delcote 10 architectural roof coating extends fabric life and reduces maintenance-related waste.
By re-purposing and making use of the existing sprinkler system, the refurbishment significantly reduces programme time, enabling customers to get operational and up and running more quickly.
Property type
Industrial / Warehouse
Size
228,485 sq ft
Tenure
To Let
Rent
POA
Business rates
£4.37 per sq ft
Promo
Up to 22m Internal Height
Name
Size - SqFt
Size - SqM
Availability
Ground - High Bay Warehouse (23.5m)
115,703
10,749.16
Available
Ground - Low Bay Warehouse (16m)
96,916
9,003.79
Available
1st
8,076
750.28
Available
Ground - Gatehouse & Ancillary
7,790
723.71
Available
Strategically located on Bicester Distribution Park, the building benefits from direct access via Charbridge Lane and immediate proximity to leading logistics occupiers. Its position on the eastern edge of Bicester provides fast links to the A41, M40 and key regional distribution corridors serving Oxfordshire, the South Midlands and London logistics markets.
The property is located on Bicester Distribution Park, which lies approximately 4 miles north east of Junction 9 of the M40, via the A41.
The A34 is accessed from J9 M40 providing a key route south to the M3 and Southampton Port.
The property is equidistant between J16 M25 (50 minutes / 44 miles) and J3A M42 (50 minutes / 46 miles), both accessed via the M40 motorway.
The property comprises a large distribution warehouse facility with 2 storey offices, which is undergoing comprehensive refurbishment and is due to complete in Q3 2026.
The refurbishment will include a full replacement of outdated gas-fired systems with an all-electric VRF solution, driving significant carbon reductions, while high-efficiency LED lighting with daylight sensing enhances operational efficiency throughout the warehouse and ancillary areas.
Water-saving fixtures—including waterless urinals and point-of-use heaters—further minimise consumption, while the Delcote 10 architectural roof coating extends fabric life and reduces maintenance-related waste.
By re-purposing and making use of the existing sprinkler system, the refurbishment significantly reduces programme time, enabling customers to get operational and up and running more quickly.
Property type
Industrial / Warehouse
Size
228,485 sq ft
Tenure
To Let
Rent
POA
Business rates
£4.37 per sq ft
Promo
Up to 22m Internal Height
Name
Size - SqFt
Size - SqM
Availability
Ground - High Bay Warehouse (23.5m)
115,703
10,749.16
Available
Ground - Low Bay Warehouse (16m)
96,916
9,003.79
Available
1st
8,076
750.28
Available
Ground - Gatehouse & Ancillary
7,790
723.71
Available
Strategically located on Bicester Distribution Park, the building benefits from direct access via Charbridge Lane and immediate proximity to leading logistics occupiers. Its position on the eastern edge of Bicester provides fast links to the A41, M40 and key regional distribution corridors serving Oxfordshire, the South Midlands and London logistics markets.
The property is located on Bicester Distribution Park, which lies approximately 4 miles north east of Junction 9 of the M40, via the A41.
The A34 is accessed from J9 M40 providing a key route south to the M3 and Southampton Port.
The property is equidistant between J16 M25 (50 minutes / 44 miles) and J3A M42 (50 minutes / 46 miles), both accessed via the M40 motorway.
To comply with Anti Money Laundering regulations, Hollis Hockley undertake ID checks for all successful purchasers and tenants where legislation requires us to do so.